Concrete pumps placing concrete slab

Lineage Logistics (PFS)

Location

Richland, WA

Completed

Scope of Work

Slab Flatwork, Tilt Up Panels, Loading Dock Slabs, Densifier Installation, Exterior Paving

The PFS Project consists of a 450,000SF, 125’ tall rack-supported building with 18” thick structural slabs and 3 separate freezers totaling in 315,000SF. The slabs were completed in 7 total pours and achieved a FF75/FL45 flatness exceeding the specifications. Other work includes 125,000SF of tilt up panels, loading dock slabs, densifier installation, and 500,000SF of exterior paving. The facility expanded to 5 freezers in 2019 and includes a super-flat high occupied freezer.

New projecT? Let's Talk.

More Projects