Since 2009, Columbia Reach has expanded fruit storage 4 times and added a 30,000SF packing line, the first Ductilcrete slab in the valley, and added 37 additional controlled atmosphere rooms which consist of 427,000SF of slab on grade, 354,000SF of tilt up panels, and 183,000SF of exterior paving.